Wednesday, December 5, 2012

Man These Guys Can Move

Oh my. I was very skeptical that the house would be done by the 14th and ready to close on the 20th. They need a week for it to be done before closing to do the final walk through, final inspections, final appraisal and fix any things we put on a punch list at the walk through.

When the kids and I went by today, they were starting to pour the driveway, sidewalk, front walk, and back stoops. They have finished painting and have tiled the bathrooms, laundry room, and kitchen backsplash. There is still some trim that needs to be installed though. They were putting in the hard wood floors this afternoon.

Here is what I can think that they still have to do: faucets, light fixtures, garage doors, steps in garage to back door, and steps to french doors in back, carpet, mirrors, final hvac install, appliances, landscaping, and shelving in the closets. Amazing that it will all get done in a week.

Here are some pictures from the last couple visits. I couldn't get in this afternoon as they were doing the floors, but popped in quickly this morning. I was wrangling the kids though, so the pictures are few.

Getting ready to start pouring cement.

Ava and Reid's bath. The hazy stuff is stuff in the air that the flash illuminated but I couldn't see. Gross.

Laundry room

Master Bath

Shutters on, in process of painting porch railing


No comments:

Post a Comment