Friday, December 14, 2012

Smooth Sailing? What's that?

Our builder called today and said he is going to move our closing to Dec 28th. This is not surprising and I am actually ok with it all. The movers aren't coming till the 29th, and I will just get Lowes to hold our fridge for delivery on the 29th.

I would rather they get everything right before we close than have a huge list they have to handle after closing. We will definitely still have to have work done on closing but I want to minimize it. They ordered the wrong garage doors so they will install the wrong ones and change them out after closing. The manufacturer can't get the correct doors until after the first of the year.

I went by today and talked to the builder and pointed out a couple of issues to him. I asked about our tv prewire above the fireplace and he looked at me with a blank stare. Glad I brought it up. He had no clue the AV company needed to come out and do that.

Our final building permit failed today because the master shower door wasn't up when the inspector came by. It was up 30 minutes later. ugh. Timing. The inspection is called back in for Monday. We are still waiting on the electric inspection and the water meter to be installed.

There is a lot of touch up painting left, cabinet work in both guest baths, cabinet light rail to hide the under cabinet lights, window blinds, tv wiring, some hinges need to be swapped out, and the front porch needs more painting.

We are hoping to have our walk through at the end of this week and close on the 28th. Fingers crossed.

Bonus room painted Tony Taupe

Powder room

Stained stair rail

Ava and Reid's bath

Master shower door on now.

Master Bath mirrors and lights in.


Pantry shelves. Definitely want them to go up higher for storage. Project for Jeff.

I can't stop standing in my kitchen. I love the stove and the built in oven/micro combo. I want to switch out the hood though as it looks too skinny for the space and I feel like you can see the underside. 

No comments:

Post a Comment