We went to the new neighborhood to trick or treat tonight and of course see the house. Here is a quick recap of what has changed since the last post.
They poured the concrete floors of the garages and the concrete floor of the front porch. Most of the windows are installed. The cable has been run and the materials for drywall have been delivered and are waiting in the house.
| Eating peanut butter and jelly sandwiches and chipotle before trick or treating. |
| Little Red Riding hood and Lion |
| Garage that connects to the house (mine) |
| Garage next to the house (Jeff's) |
| Front porch |
![]() |
| Front porch from one end looking to the other end |
![]() |
| Looking through the front door |
| Looking into the living room from the kitchen. drywall materials here. |
| Kitchen windows are in. |
![]() |
| drywall materials in the bonus room |
| Hvac looks like a big black halloween spider! |
![]() |
| upstairs furnace |
| window over bathtub |
| master bedroom windows and drywall materials |
| small black circles are pre wires for wall sconces on either side of king bed. |
| another view of front porch with concrete floor in |
| picture of both garages |






No comments:
Post a Comment